[1]
Billah, M. et al. 2021. The Economic Order Quantity Repair and Waste Disposal Model: Solution Approaches.
GANIT: Journal of Bangladesh Mathematical Society
. 40, 2 (Jan. 2021), 134–144. DOI:https://doi.org/10.3329/ganit.v40i2.51316.